The Clyde Tunnel: Glasgow's Road Under the River
Contents
The Clyde Tunnel carries the A739 under the river between Whiteinch on the north bank and Linthouse in Govan on the south. When it opened in 1963, the Clyde was still lined with shipyards, and a bridge would have blocked the ships. So Glasgow went under the river, as it had done twice before in the 1890s. Building it left lasting damage in the bones of many of the men who dug it.
TL;DR
- established Glasgow's first road under the Clyde was the Harbour Tunnel at Finnieston, opened in 1895: three tunnels reached by hydraulic lifts inside two domed brick rotundas, which still stand.
- established The Clyde Tunnel, two parallel road tunnels each 762 m long, was built between 1957 and 1964. A tunnel was chosen over a bridge so as not to obstruct shipping.
- established Miners drove the tunnels with shields in compressed air. A 1962 X-ray survey of 241 of the workers found bone damage in 47 of them, and the cost to the men was raised in the House of Commons in 1965.
- shared Two men are reported to have died from the effects of working in compressed air. The figure is widely repeated but rests on later press accounts.
- established The Queen opened the first tunnel on 3 July 1963; the second followed on 23 March 1964. The crossing now carries about 65,000 vehicles a day.
Key Facts
- Route
- A739, Whiteinch (north) to Linthouse, Govan (south)
- Design
- Two parallel tunnels, one for each direction, two lanes each
- Length
- 762 m (2,500 ft) each
- Designers
- Sir William Halcrow & Partners
- Tunnel contractor
- Charles Brand & Son Ltd
- Construction
- June 1957 to March 1964
- Opened
- 3 July 1963 (northbound); 23 March 1964 (southbound)
- Opened by
- The Queen
- Cost
- About £10.5 million
- Traffic
- About 65,000 vehicles a day
- Also inside
- Pedestrian and cycle tunnels beneath each road deck
- Predecessor
- Glasgow Harbour Tunnel, Finnieston, opened 1895
A Note on Claims and Evidence
Each major claim carries one of three labels. established means supported by primary records, official bodies or several independent reliable sources. shared means the core fact is sound but sources disagree on details, dates or interpretation. traditional means widely repeated but not traceable to a primary or independent source.
The Clyde Tunnel's dates, dimensions and contractors are well recorded by the Scottish Roads Archive and the Glasgow Motorway Archive. The best primary evidence for the workers' experience is a House of Commons debate of 29 July 1965. Two points are weaker: the number of deaths, which comes from press accounts rather than an official record, and the stories told about the bends on Govan Road. For the Harbour Tunnel, Historic Environment Scotland's listing and Canmore record disagree on when the vehicle tunnels closed.
Timeline
The Glasgow Harbour Tunnel Company is authorised by Parliament.
The Harbour Tunnel opens between Finnieston and Mavisbank Quay.
The Harbour Tunnel company closes after losses; the tunnel reopens in 1912.
Glasgow Corporation buys the Harbour Tunnel.
The Harbour Tunnel's vehicle tunnels close.
City engineer Robert Bruce proposes a road crossing between Whiteinch and Linthouse.
Parliamentary powers are granted for the Clyde Tunnel.
Sir William Halcrow & Partners are appointed to design it.
Ground investigations show that shields and compressed air will be needed.
Construction begins.
Compressed-air work ends; 241 men are X-rayed.
The Queen opens the northbound tunnel. It carries traffic both ways until the second tunnel is ready.
The southbound tunnel opens.
The workers' bone damage is debated in the House of Commons.
The south approach road to the M8 opens.
The north approach at Whiteinch is completed.
Details
The first crossing: the Harbour Tunnel, 1895
established Glasgow's first road under the Clyde was dug by the Glasgow Harbour Tunnel Company, authorised in 1889. Its engineers, Simpson & Wilson, were also designing the Glasgow District Subway, which crossed under the river a year later. The tunnel ran from Tunnel Street in Finnieston to Mavisbank Quay on the south bank and opened in 1895.
established It was reached not by ramps but by lifts. On each bank a shaft 80 ft across and about 72 ft deep was sunk and roofed with a domed brick rotunda. Each shaft held six hydraulic lifts, supplied by the Otis Elevator Company, which lowered horses and carts to the tunnels at the bottom. Three parallel tunnels, each 16 ft in diameter, ran under the river: two for vehicles, one in each direction, and one for people on foot.
established It never paid. The company closed in 1907 because of its losses; the tunnel reopened in 1912, and Glasgow Corporation bought it in 1926. The vehicle tunnels closed during the Second World War. The pedestrian tunnel reopened in 1947 and stayed in use for decades more. The vehicle tunnels were sealed in 1986–87.
shared Historic Environment Scotland's listing gives 1940 for the closure of the vehicle tunnels; Canmore gives 1943, when the lift machinery was scrapped. Canmore also records one account that the pedestrian tunnel closed in 1980.
established Both rotundas survive. The north rotunda became a restaurant in 1988. The south rotunda at Plantation Place was listed Category B in 1986. The pedestrian tunnel still carries services, including a water main laid in 1938.
Why a tunnel, and why so slow
established After the Second World War, Glasgow badly needed another road crossing west of the city centre. In 1945–46 the city engineer, Robert Bruce, proposed one between Whiteinch and Linthouse as part of an outer ring road. A tunnel was chosen rather than a bridge because the river was still a working shipbuilding river, and a bridge would have obstructed ships.
established Parliament granted the powers in 1948, and Sir William Halcrow & Partners were appointed as designers in 1951. Ground investigations in 1952 showed how difficult the ground below the river would be: shields and compressed air would be needed. Post-war shortages of money held the project back, and construction did not begin until 26 June 1957.
Building it under pressure
established The main contractor was Charles Brand & Son. The tunnels were driven with shields, steel cylinders pushed forward through the ground, on the principle Marc Isambard Brunel had used for the Thames Tunnel more than a century earlier. Behind the shields the tunnels were lined with cast-iron rings, each made of 16 segments; the segments came from the Carron Company at Falkirk. To keep the river and the soft ground from flooding in, the working faces were kept at high air pressure.
established Sixteen miners at a time worked the shields in the compressed air. Coming back to normal pressure safely took about an hour, and some men refused to wait. Decompression sickness, "the bends", followed.
established The longer-term damage only became clear later. On 29 July 1965 Sir Myer Galpern, MP for Glasgow Shettleston, told the House of Commons that about 1,400 men had worked in the tunnel's compressed air. When the compressed-air work ended in December 1962, 241 of them were X-rayed; 47, about one in five, already had bone damage, and 23 had lesions at the head of the thigh bone or upper arm bone, which can lead to disability. One worker, James Paterson, had sued for £8,000 in the Court of Session and lost, because his employers had met their legal obligations. Two other men had received ex gratia payments of £500 and £750. The minister who replied, Ernest Thornton, said the regulations gave as much protection as knowledge then allowed, but accepted that they did not prevent the disease.
shared Two men are reported to have died from the effects of working in compressed air. The figure appears in later press accounts, including The Scotsman in 2012 and Glasgow Live. The 1965 Commons debate does not mention deaths.
traditional It is often said that signs on Govan Road warned that a man seen staggering might not be drunk but suffering from the bends. The story is repeated in the press, but no photograph or record of such a sign has been traced.
Opening, 1963–64
established The northbound tunnel was finished first, and the Queen opened it on 3 July 1963. For eight months it carried traffic in both directions, with overtaking banned. The southbound tunnel opened on 23 March 1964. Once the tunnel was open, the Govan and Whiteinch ferries were withdrawn.
established Each tunnel carries a two-lane road deck 6.7 m wide on a gradient of almost 6%, with a design speed of 30 mph. Beneath each deck runs a separate tunnel for pedestrians and cyclists. Fans in the ventilation buildings at each end can blow about 6,400 cubic metres of fresh air onto the roads every minute.
shared The project cost about £10.5 million according to the Scottish Roads Archive and the Glasgow Motorway Archive; some press accounts give £10 million. The approach roads came later: the south approach to the M8 at Cardonald opened in 1967 and the north approach at Whiteinch in 1969.
The tunnel today
established The Scottish Roads Archive records that more than 27,000 vehicles a day used the tunnel within a year of opening. It now carries about 65,000 vehicles a day, and more than 25 million vehicles, cyclists and pedestrians a year. Glasgow City Council runs it from a control room above the northern approach, and it was extensively refurbished in the early 2000s to meet modern fire-safety standards.
established Generations of Glasgow children have tried to hold their breath for the length of the tunnel, a drive of just under a minute.
Did You Know?
- The Clyde Tunnel was not the first road under the Clyde. The Harbour Tunnel at Finnieston opened 68 years earlier, in 1895.
- Horses and carts reached the Harbour Tunnel by lift: six hydraulic lifts in each rotunda.
- The Harbour Tunnel and the Glasgow Subway were designed by the same Glasgow engineers, Simpson & Wilson.
- The Clyde Tunnel's cast-iron lining segments were made by the Carron Company of Falkirk, the ironworks famous for the carronade.
- For its first eight months, the Clyde Tunnel was a single tunnel with traffic running both ways.
- About 1,400 men worked in compressed air on the tunnel. One in five of those X-rayed in 1962 already had bone damage.
- Each road tunnel has a separate tunnel for pedestrians and cyclists underneath it.
FAQ
1When did the Clyde Tunnel open?
The northbound tunnel opened on 3 July 1963, opened by the Queen. The southbound tunnel opened on 23 March 1964.
2Where does it run?
Under the Clyde between Whiteinch on the north bank and Linthouse, in Govan, on the south.
3Why was a tunnel built instead of a bridge?
In the 1950s the river was still busy with ships from the yards, and a bridge would have obstructed them.
4How long is it?
Each of the two tunnels is 762 m (2,500 ft) long.
5How was it built?
With tunnelling shields working in compressed air, which kept water and soft ground out of the workings while the cast-iron lining was built.
6Did anyone die building it?
Two men are reported to have died from the effects of working in compressed air. Many more suffered bone damage, which was debated in Parliament in 1965.
7Can you walk or cycle through it?
Yes. Each road tunnel has a separate pedestrian and cycle tunnel underneath it, with controlled access.
8What was the Harbour Tunnel?
A Victorian crossing under the Clyde at Finnieston, opened in 1895, reached by hydraulic lifts in two domed rotundas. The rotundas still stand.
9Is the Harbour Tunnel still open?
No. The vehicle tunnels closed during the Second World War and have been sealed; the pedestrian tunnel no longer takes the public but still carries services.
10How much traffic does the Clyde Tunnel carry?
About 65,000 vehicles a day.
Sources and Further Reading
Primary and Institutional
- House of Commons debate, "Clyde Tunnel Workers (Caisson Disease)", 29 July 1965, Hansard vol. 717 (api.parliament.uk/historic-hansard/commons/1965/jul/29/clyde-tunnel-workers-caisson-disease).
- Historic Environment Scotland, Canmore record "Glasgow, Lower Harbour, Harbour Tunnel" (canmore.org.uk/site/278017).
- Historic Environment Scotland, listed building LB33528, Glasgow Harbour Tunnel south rotunda, 100 Govan Road (consulted via gohistoric.com).
Scholarly and Critical
- Scottish Roads Archive, "Clyde Tunnel" (scottishroadsarchive.org/clydetunnel): planning, design, construction, dimensions, opening, traffic.
- Glasgow Motorway Archive, "Clyde Tunnel" (glasgows-motorways.org.uk/clyde-tunnel): background, construction summary, contractors, opening dates, costs.
- Medical Research Council Decompression Sickness Panel, Bone Lesions in Compressed Air Workers, with Special Reference to Men Who Worked on the Clyde Tunnels 1958 to 1963 (R. I. McCallum and D. N. Walker, c. 1966), further reading.
General
- Peter Ross, "Clyde Tunnel, a vision of beauty", The Scotsman (2012): workers, deaths, breath-holding, control room.
- Glasgow Live, "Looking back at the opening of the Clyde Tunnel" (via inkl): construction start, deaths, opening.
Caveats: Myths and Disputed Claims
- Myth: the Clyde Tunnel was the first tunnel under the Clyde. The Harbour Tunnel at Finnieston (1895) and the Glasgow Subway (1896) both crossed under the river first.
- Disputed: two deaths. The number comes from later press accounts. The 1965 Commons debate on the workers' illness does not mention any deaths.
- Disputed: the Govan Road warning signs. The story that signs told passers-by a staggering man might have the bends is repeated in the press, but no sign or record of one has been found.
- Disputed: when the Harbour Tunnel's vehicle tunnels closed. Historic Environment Scotland gives 1940; Canmore gives 1943.
- Disputed: the cost. Usually given as £10.5 million; some accounts say £10 million.
Finished reading? Try the Fact Machine: three reels, one surprising Scottish connection →